Request an assessment

Development · Power market · Asset management

Frompermittosettlement.

We develop renewable power plants, operate them in the Mexican wholesale electricity market and manage their performance for owners and investors.

Teotlán, BCS · In commercial operation since June 2026

In operation under management
499kW AC
Teotlán, BCS · since June 2026
Energy under management
~100MWh/month
Monthly average · since June 2026
In trading, hedging and development
5years
Team experience

Figures to be validated before launch.

What we do

Three service lines covering a plant’s full life cycle.

Engage them together or separately.

  • Plant development

    From site and solar resource to CENACE testing and commercial operation.

  • Power market

    Scheduling, deviation control, settlement reconciliation, CELs and capacity.

  • Asset management

    Monthly KPI dashboard, O&M oversight and reporting to owners and investors.

See services
Life cycle

One team at every stage.

  1. 01 Development

    Origination and site

    Land and solar resource assessment.

  2. 02 Development

    Feasibility and design

    DC/AC design, P50/P90 financial model.

  3. 03 Development

    Permits and interconnection

    Filing and follow-up with authorities.

  4. 04 Development

    Construction and CENACE testing

    240 h continuous run and curtailment test.

  5. 05 Market

    Scheduling, settlement and hedging

    Day-ahead, real-time, reconciliation, CELs and capacity.

  6. 06 Asset mgmt.

    Performance, maintenance and reporting

    Monthly KPIs, O&M and incidents.

Case study

Teotlán

A real plant, taken from CENACE testing to commercial operation and managed month by month.

Teotlán photo pending

Fact sheet

Location
Comondú, Baja California Sur (Mulegé power system)
Capacity
499 kW AC · kWp DC to be confirmed against as-built
CENACE testing
240 h continuous injection (May 2026) and curtailment test (June 2026)
Commercial operation
June 2026
fuente’s role
Project management and asset management wording to be validated with the owner

Findings

  • +15%energy

    Soiling

    Cleaning raised performance from 86.7% to 99.7% of P50.

  • 1fault

    Metering

    Revenue meter fault detected and quantified by cross-checking the meter against the inverters.

  • 94–95%of node

    Market

    Capture price versus the node average, tracked monthly against settled amounts.

Performance vs. P50
P50 · 100%
Before cleaning
86.7%
After cleaning
99.7%

Source: Teotlán metering, 2026.

Findings subject to owner approval.

Read the full case
Platform

The technology behind our management.

The monthly dashboard we already use to manage Teotlán, on its way to becoming a product. Today it is delivered to clients as a monthly report.

In development

Early access
Plant A · 499 kW AC Illustrative data

Current month

Actual vs. expected generation
98.4%
Performance vs. P50
99.1%
Capture price vs. node
94.6%
Day-ahead vs. real-time deviation cost
1.8% of DA revenue
Payment received on time
Yes
Open incidents
2at cut-off

Daily generation curve

Investors

International capital, Mexican assets.

We support funds, IPPs and family offices seeking renewable exposure in Mexico, with local operations and reporting in English.

  1. 01

    Origination

    Projects and operating plants screened with technical and market judgement.

  2. 02

    Local due diligence

    Review of resource, design, interconnection, settlements and contracts.

  3. 03

    Management

    Performance, market and suppliers, month by month, through a single counterpart.

  4. 04

    Reporting in English

    Investor reporting to institutional standards.

Co-investment and PPA models

We also structure supply arrangements for companies (Smart PPA) and co-investment. Mexico’s accelerated depreciation for renewable equipment (LISR) can be part of the model; each case is assessed on its own assumptions.

Book a call
Professional photo pending
About

Who is behind fuente.

Arturo Cota

Founder · Madrid · Mexico

Short bio pending: background in trading, hedging and plant development; bridge between Madrid and Mexico.

LinkedIn

Partners: shown only if real and authorised to be defined.

Insights

What we are learning from the market.

  • LinkedIn article pending

  • LinkedIn article pending

  • LinkedIn article pending

FAQ

Frequently asked questions

What plant sizes do you work with?

From exempt or distributed generation up to to be defined MW.

Can you take over a plant that already works with another provider?

Yes. We start with an assessment and a transition plan.

Do you represent my plant in the market?

No. We work with your supplier or market representative and handle strategy, scheduling and reconciliation.

What do I receive each month?

A performance report, settlement reconciliation and incident status.

Do you work with foreign investors?

Yes. Reporting in English and a presence in Madrid.

Is the platform available yet?

It is in development. Today it is delivered to clients as a monthly dashboard.

How do you charge?

A monthly fee per plant, plus one-off projects to be defined.

Contact

Request an assessment of your plant.

We review three months of settlements, metering and performance against P50, and tell you how much is being left on the table.

Book a call

30 minutes to learn about your plant or project.

See available times

Direct email

contacto@fuente.mx

Booking link and email pending.